Mendon High School

  • Capital Project Update August 27, 2015

    • New secured main office/main entrance almost complete.

    • Updating electric panels and wiring throughout to support modern classroom technology.

    • Replaced air-handling units, upgraded classroom units and connections, continue balancing the redesigned plenum system to improve air quality.

    • Continued work on pool including heat exchanger, HVAC connections.

    • Replaced loading dock, south entrance ramp, pavement, auto shop.

    • All corridor ceiling tiles and floor tiles removed and ceiling tiles were replaced. Flooring is next.

    • Stadium turf, track, ticket booth, storage facility, and fencing is complete.

    • Tennis courts repaired and patch resurfaced.

    • Work inside and outside MHS will continue through fall 2016.

     


    Mendon High School Highlights 

    • Art room renovations, including casework & sinks

    • Masonry restoration

    • Corridor flooring through-out building

    • First floor ceilings

    • Loading dock restoration

    • Dust collector in wood shop

    • Exhaust system in auto shop

    • Pool filtration equipment, heat exchanger, main drain and door replacements

    • PA speakers

    • Auditorium curtains

    • Cafeteria flooring & painting

    • Kitchen ceiling and grease trap

    • Air handling unit (AHU) replacement in gym & locker rooms

    • Air handling unit (AHU) replacement in auditorium

    • Air handling unit (AHU) replacement in mechanical rooms

    • Electrical main distribution panel (MDP), electric panels and wiring replacements