Mendon High School
-
Capital Project Update August 27, 2015
-
New secured main office/main entrance almost complete.
-
Updating electric panels and wiring throughout to support modern classroom technology.
-
Replaced air-handling units, upgraded classroom units and connections, continue balancing the redesigned plenum system to improve air quality.
-
Continued work on pool including heat exchanger, HVAC connections.
-
Replaced loading dock, south entrance ramp, pavement, auto shop.
-
All corridor ceiling tiles and floor tiles removed and ceiling tiles were replaced. Flooring is next.
-
Stadium turf, track, ticket booth, storage facility, and fencing is complete.
-
Tennis courts repaired and patch resurfaced.
-
Work inside and outside MHS will continue through fall 2016.
Mendon High School Highlights
-
Art room renovations, including casework & sinks
-
Masonry restoration
-
Corridor flooring through-out building
-
First floor ceilings
-
Loading dock restoration
-
Dust collector in wood shop
-
Exhaust system in auto shop
-
Pool filtration equipment, heat exchanger, main drain and door replacements
-
PA speakers
-
Auditorium curtains
-
Cafeteria flooring & painting
-
Kitchen ceiling and grease trap
-
Air handling unit (AHU) replacement in gym & locker rooms
-
Air handling unit (AHU) replacement in auditorium
-
Air handling unit (AHU) replacement in mechanical rooms
-
Electrical main distribution panel (MDP), electric panels and wiring replacements
-